Products

Building in the tightest of spaces – NeoR lightweight formwork makes it easy

Building in the tightest of spaces – NeoR lightweight formwork makes it easy

An all-round success using TTK circular trapezoidal girder formwork from PASCHAL for the general modernisation of the wastewater treatment plant

An all-round success using TTK circular trapezoidal girder formwork from PASCHAL for the general modernisation of the wastewater treatment plant

Concrete screw completes the assortment of PASCHAL adjustable props

Concrete screw completes the assortment of PASCHAL adjustable props

PASCHAL is looking back on a successful bauma 2022

PASCHAL is looking back on a successful bauma 2022

LOGO.pro wall formwork offers flexible anchoring technology for every requirement

LOGO.pro wall formwork offers flexible anchoring technology for every requirement

Innovative NeoR lightweight formwork as a further development of the Modular universal formwork

Innovative NeoR lightweight formwork as a further development of the Modular universal formwork

Spitallamm dam: Doka makes a lasting impact on Swiss energy future

Spitallamm dam: Doka makes a lasting impact on Swiss energy future

Longstanding PASCHAL customer invests in LOGO.pro

Longstanding PASCHAL customer invests in LOGO.pro

ALTRAD RMD KWIKFORM RECOMMENDS GROUND SHORING EQUIPMENT FOR EXCAVATIONS TO COMBAT STEEL PRICE HIKES

ALTRAD RMD KWIKFORM RECOMMENDS GROUND SHORING EQUIPMENT FOR EXCAVATIONS TO COMBAT STEEL PRICE HIKES

New NeoR multi-purpose panel offers an impressively wide range of possible uses

New NeoR multi-purpose panel offers an impressively wide range of possible uses

Doka boosts construction site safety with Xsafe Catch Fan

Doka boosts construction site safety with Xsafe Catch Fan

PASCHAL helps expand the Karlsruhe-Basel railway line and Rhine Valley Railway

PASCHAL helps expand the Karlsruhe-Basel railway line and Rhine Valley Railway

PASCHAL presents formwork for optimal concrete construction at bauma 2022

PASCHAL presents formwork for optimal concrete construction at bauma 2022

Fast formwork for a large hotel complex

Fast formwork for a large hotel complex

PASCHAL creates the basis for a Commercial building construction for Arpitha Constructions

PASCHAL creates the basis for a Commercial building construction for Arpitha Constructions

Doka introducing scaffolding solutions at bauma 2022

Doka introducing scaffolding solutions at bauma 2022

Concrete, the prevailing element for the Riedpark covered market in Lauchringen

Concrete, the prevailing element for the Riedpark covered market in Lauchringen

PASCHAL facilitates the construction of a concrete floating platform for the L'île Ô theatre in Lyon

PASCHAL facilitates the construction of a concrete floating platform for the L'île Ô theatre in Lyon

Technology Aids Scaffolding

Technology Aids Scaffolding

PASCHAL Maturix impresses in the production of pre-fabricated components

PASCHAL Maturix impresses in the production of pre-fabricated components

Doka UniKit: Smart infrastructure solutions via plug & play

Doka UniKit: Smart infrastructure solutions via plug & play

Doka Xsafe: Safety matters. Always.

Doka Xsafe: Safety matters. Always.

PASCHAL INDIA is the part of creating landmark building project form the basis for a Construction of Federal Parliament building complex @ Kathmandu for Tundi Construction Pvt. Ltd. in Nepal

PASCHAL INDIA is the part of creating landmark building project form the basis for a Construction of Federal Parliament building complex @ Kathmandu for Tundi Construction Pvt. Ltd. in Nepal

RMD KWIKFORM BRIDGES GAP IN THE CONSTRUCTION MARKET WITH NEW R800 HEAVY-DUTY PANEL GIRDER SYSTEM

RMD KWIKFORM BRIDGES GAP IN THE CONSTRUCTION MARKET WITH NEW R800 HEAVY-DUTY PANEL GIRDER SYSTEM

Electricity pylon foundations for supply security and grid stability during the clean energy transition, formed with PASCHAL formwork

Electricity pylon foundations for supply security and grid stability during the clean energy transition, formed with PASCHAL formwork

Consistent formwork concept for West Fire Sta-tion

Consistent formwork concept for West Fire Sta-tion

Yet again, PASCHAL demonstrates total form-work expertise with the very latest of wind power systems

Yet again, PASCHAL demonstrates total form-work expertise with the very latest of wind power systems

Modular GE universal formwork helps provide drinking water

Modular GE universal formwork helps provide drinking water

Full power for power plant construction

Full power for power plant construction

The Precast Reinforced Concrete Plant of Beton Tille GmbH & Co. KG

The Precast Reinforced Concrete Plant of Beton Tille GmbH & Co. KG

A Height of 32 Metres Reached in 10 Concreting Cycles

For a stairwell and lift tower, LOGO.3 wall formwork was combined with the climbing system 240 and presented itself as the perfect PASCHAL climbing duo

Bridging the Himalayas with an Engineering Marvel

Named the Anjikhad Railway Bridge, Doka India proposed an effective and efficient formwork solution for the cable-stayed, single-pylon to work with the site’s complex geology.

Major new building for mental health rehabilitation constructed with support from PASCHAL

For the construction of the new mental health rehabilitation centre in Beroun, , the construction company has opted for PASCHAL.

PASCHAL creates the basis for a 53-metre high housing complex

The Orange blue bell Towers are a 53-metre- high at the heart of

intricate circular shapes, then PASCHAL is the only way to go

Soprema, a waterproofing and insulation manufacturer, is fulfilling its entrepreneurial spirit in the port of Strasbourg with a futuristic complex for its future company headquarters, in which it is investing around 45 million euros.

RMD KWIKFORM SUPPORTS WORLD MENTAL HEALTH DAY

RMD Kwikform (RMDK), a global leader in formwork, falsework, and ground shoring solutions, is supporting World Mental Health Day on 10 October 2021 by ensuring its employees have equal access to mental health support through its global network of Mental Health First Aiders (MHFAs).

NeoR lightweight formwork expanded to include new accessories

To make handling the new NeoR lightweight formwork even easier, PASCHAL is expanding the product portfolio with four new accessories.

Circular reinforced concrete constructions for biogas plants formed quickly and safely with PASCHAL

In the Swiss village of Steckborn, two circular constructions were completed by Stutz AG using a combination of TTK – circular trapezoidal girder formwork with clamp connection and Multip, the multi-functional work platform.

The search is on for smart and innovative ideas for digitalization in shell construction

The countdown has started. Ideas for innovative solutions that make a significant contribution to digitalization in shell construction can be submitted for the Josef Umdasch Research Prize until 7 November 2021.

New CEO at Doka Robert Hauser will take over as chairman of the Executive Board on 1 July 2021.

The international formwork and scaffolding company Doka welcomes a new CEO: On 1 July, Robert Hauser will take over as chairman of the Executive Board.

A simple formwork solution for slender and extremely high reinforced concrete columns

Column formwork using the LOGO system for a warehouse, for when it needs to be good, quick and cost-effective.

DOKA invests in production of the future

The new powder coating plant is one of the most modern plants of its kind in Europe and one of the largest production investments Doka has made in decades.

Nav Nirman Formwork System Pvt Ltd

Nav Nirman Formwork Systems Pvt Ltd is one of the leading Manufacturers and Supplies Advanced Formwork System suitable for all types of Structures like Slab, Wall, Column etc.. Our Formwork System is both Advanced and most Economical in terms of Price suitable for all types of Construction application.

DOKA now includes scaffolding amongst its core offerings

Doka now stands for formwork and scaffolding. While much of the construction industry has remained stagnant for the past forty years, some businesses, such as Doka have continued to invest throughout their development in order to provide, faster, more cost-effective and safer products for their clients.

PASCHAL formwork creates a solid foundation for the “Treetop Walk Alsace”

The Modular/GE universal formwork from PASCHAL is being used in the foundations of the “Treetop Walk Alsace” on an old military base in Drachenbronn.

Useful helpers for practical application

PASCHAL supports its customers with logistic devices – the lattice box pallets and transportation box simplify the entire logistics chain and enable safe, quick, and effective work.

Orange formwork prepares the way for green agriculture

PASCHAL systems spur on the construction of abutments and wing walls for the underpass below the direct link between the A35 and the RD201.

Circular reinforced concrete columns as supporting parts for STOA169

The open-air museum on the bank of the River Ammer extends over an area of 1,600 m².

New NeoR lightweight formwork finds application in housing construction

A five-story apartment building, complete with an underground car park, is currently in progress as an inner-city infill site in Kleefeld, Hanover

SMART solution for planning, monitoring and documentation

When it comes to planning and the collaboration of all the many participants involved in a construction project, digital tools can significantly improve productivity and cost savings.

Trending Green Building Construction Technologies

Green construction technology has become one of the hottest trends in construction.

New day care centre at the “Alten Sportzplatz” site in harmonious fair-faced concrete

Biberach (Baden) is one of the few communities in the Ortenau district with a growing population

Kuwait's first in-situ cantilever bridge project

Section RA217 of Nawaseeb Road, also known as Route 40, is one of Kuwait's most important infrastructure and transport projects and is part of the Kuwait Development Plan 2015-2020.

Circular column formwork by PASCHAL assists with the conversion of the Sendlinger Tor underground station

Since 2017, Stadtwerke München (SWM) has been engaged in extensive building work in order to make the Sendlinger Tor underground station, some of which was built more than 45 years ago, fit for the future.

TUNNELLING FOR SCIENCE Special formworks from Doka for tunnel system at CERN

The teams are hard at work in Meyrin (CH) and Cessy (FR).

Unconventional concrete structure for Haslach-based home

A concrete statement: PASCHAL formwork panels have been combined with bamboo canes to make a fire barrier of exposed concrete with a unique design.

PASCHAL is supporting the preparatory work for an innovative pilot project for a commercial building made of infra-lightweight concrete

Before the construction of REWE's DGNB-certified green building can commence, material testing of the infra-lightweight concrete has to be completed to assess the fire behavior.

Vibrant Construction Equipments Private Limited

Vibrant Construction Equipments is the leading manufacturer, supplier and exporter of all kinds of Road Construction Equipments which is located in the capital of Telangana state, Hyderabad.

Ramada Hotel takes Green Steps, deploying BuildTrack's Smart Automation for Energy Efficiency

BuildTrack, one of the leading Brands in Smart Automation & IoT (Internet of Things) products and solutions, deployed its solutions for Ramada Hotel, Lucknow.

PASCHAL formwork makes concrete (props) of any shape

Steinach-based formwork expert PASCHAL supplies a Hungarian prefabricated plant with high-quality, easy-to-handle special column forms with 30 different cross-sections.

Intelligent concrete monitoring in real time with PASCHAL Maturix™

Thanks to real-time monitoring, PASCHAL Maturix™ facilitates the efficient concreting process and, at the same, time provides well-founded evaluations.

The LTC is being developed on a construction site of more than 11,000 m² in Karlsruhe at a cost of more than 22 million euros.

The harmoniously designed campus is being con-structed with the constant collaboration of PAS-CHAL. LOGO.3, Modular formwork, Grip, TTR, PASCHAL-Deck and the new lateral protection sys-tem are being deployed for this purpose.

Making an impression with fair-faced concrete The central administrative headquarters of Banca Transilvania

KÉSZ Construction Romania and Doka Romania have each pooled their experience and technical expertise, launching a national benchmark project with fair-faced concrete requirements. The construction of the central administrative

Three times is the magic number for PASCHAL in the 8.3 million euro new construction in Kiel, Germany

The Jürgen Leptien Bauunternehmung GmbH & Co. KG construction company is using formwork and formwork systems from PASCHAL to shape the reinforced concrete structures: the LOGO.3 wall formwork system, the TTR circular trapezoidal girder formwork and circular column formwork made of steel with three different diameters.

PASCHAL introduces prototype for the one-sided formwork anchor system at bauma 2019

PASCHAL is introducing an innovative formwork solution with tie rods to be operated from one side at the bauma 2019. The new LOGO.pro system offers customers all the advantages of one-sided tie rods.

Achieve more with LOGO.3 – now with new integrated clamp mounting

Since February 2019 all large-size and midi panels of the LOGO.3 formwork have been equipped with clamp mountings for the LOGO wedge clamps.

PASCHAL formwork and supporting jacks are involved in the renovation of this reservoir outlet. Renovation of this reservoir outlet is one element of the complete renovation of the downstream reservoir.

PASCHAL's customer, the U&W Group, is currently engaged in extensive renovation work on the reservoir outlet of the downstream reservoir on behalf of Harzwasserwerke GmbH. For the singlesided new reinforced concrete facing structures LOGO.3 wall form work combined with supporting jacks are in use.

Concrete cylinder for gastronomic silo realised with formwork and climbing technology from PASCHAL

A reinforced concrete cylinder measuring around 30 m in height created with a combination of TTR circular Trapezoidal girder formwork and the climbing installation 200 from PASCHAL in 12 concreting cycles.

Solid foundations for the energy transition

Foundations for 45 pylons in section D in terrain that was in parts almost impassable were formed with impressive accuracy using formwork systems from PASCHAL.

Modern Formwork Systems for Fast Track Construction

Traditional formwork for concrete construction normally consisted of bespoke solutions requiring skilled craftsmen. This type of formwork often had poor safety features and gave slow rates of construction on-site and huge levels of waste – inefficient and unsustainable.

Conservation of species and preservation of historic buildings combined with regenerative energy generation

The Kirchbaumwasen construction site presents many challenges that were particularly evident during construction work. Many new structures

PASCHAL is supporting the Sita Rama irrigation project with comprehensive formwork expertise

With the Modular universal formwork, PASCHAL is providing a tailor-made solution for the construction of a single-lane road bridge as part of the Sita Rama irrigation project

A pumping station for flood protection

The reinforced concrete structures of the pumping station in the town of Sömmerda, Thuringia, are currently being created with the LOGO.3 universal wall formwork system and the GASS aluminium shoring system from PASCHAL.

Formwork for the new bridge construction over the River Kinzig between Steinach and Bollenbach successfully completed

The bridge is part of the much travelled cycle path, popular among tourists to the Black Forest, which runs between Offenburg and Freudenstadt. It also acts as an important link between Bollenbach and Steinach for cyclists and pedestrians.

Formwork systems from PASCHAL used for the fair-faced concrete tower at the emergency centre in Cernay-Wittelsheim.

The approximately 25 m high fair-faced concrete tower was built by Scherberich S.A. in 8 concreting cycles, with support from PASCHAL.

Sewage treatment plant expansion valued at about 40 million euros in Forchheim with the second largest final sedimentation tanks in Germany for 600,000 residents.

The curved wall structure for final sedimentation tank no. 5 is formed with the TTR trapezoidal girder formwork at a forming height of 5.25 m including the haunch formwork at the base with an inside diameter of 72 m and concreted in one height operation.

PASCHAL for the 2nd time at the Excon trade fair

The formwork and shoring expert PASCHAL will be presenting the practical application possibilities and system diversity of the PASCHAL formwork systems to visitors to this year's Excon at booth B23 in hall 4.

Barntrup bypass – fast forming times for roadworks to get traffic flowing smoothly

Using PASCHAL systems, the reinforced concrete work for two new bridges for the Barntrup bypass is going well, meaning that road and rail traffic will be flowing smoothly by the end of 2019.

PASCHAL's new webshop goes online

Now even more informative and modern, as well as "responsive" of course – the relaunch of PASCHAL's webshop (www.formwork-shop.com) offers both visual and technological changes and fresh content.

DokaCAD for Revit Powerful software for productive formwork planning in BIM

Efficient formwork systems have a significant influence on the success of a shell construction project, which requires correct and reliable formwork planning and optimal cycle planning

Practical increase in efficiency with the LOGO. 3 thanks to fewer tie points.

Thanks to the well-balanced range of panels and the stable construction of LOGO.3 formwork, there are many practical ways of significantly reducing the number of tie points so that installing the LOGO.3 system is even more efficient without compromising in terms of safety.

Dismantling the “Deutsche Welle” From top to bottom instead of high into the sky

As urban centers become increasingly built up, old buildings must be demolished. Former landmarks are torn down to create new, modern replacements

Extension of Gopalpur Port with the Modular universal formwork from PASCHAL

Gopalpur Port is located in the Ganjam district of Odisha and is being developed by Gopalpur Ports Limited (GPL) under the Build Own

Appraisal 2019: First-ever survey on 'What India Wants'

Shine.com, India's 2nd largest job portal, recently conducted a first-of-its-kind appraisal survey focusing on the expectations of employees

Ideas and plans become reality with the PAS-CHAL AR app

In order to optimise processes surrounding formwork planning, alongside BIM, PASCHAL also relies on augmented reality (AR).

A passage channel structure is currently being created with the LOGO.3 formwork system from PASCHAL.

In 2018 the state made around € 86 million available for the construction of flood protection measures.

Everything is progressing precisely in the construction of the new terminal in Frankfurt with Circular column formwork from PASCHAL.

The plan is for the first departure gate for the new terminal to be put into operation in 2021. 300,000 m³ of concrete, 72,500 t of structural steel and 11,500 m² of glass facade will be installed by then.

SMART solution for planning, monitoring and documentation

When it comes to planning and the collaboration of all the many participants involved in a construction project, digital tools can significantly improve productivity and cost savings. It's not primarily about working faster – these tools facilitate coordination and successful planning

Circular reinforced concrete columns as supporting parts for STOA169

The open-air museum on the bank of the River Ammer extends over an area of 1,600 m². The roof panels, made from ready-mixed concrete, rest upon columns with a reinforced concrete core.

Canopy walkways are now very popular - just as popular as the formwork of their lift shafts with support from PASCHAL. This time, the lift and observation tower rises 44 metres up into the sky

With the current project, the name says it all – a 44-metre-high reinforced concrete structure as a massive anchoring point and barrier-free access to the “Heidehimmel” (which translates as the heather heavens) canopy walkway at the Lüneburger Heide wildlife park in Hanstedt Nindorf, Germany.

The conservation of species and preservation of his-toric buildings is being combined with regenerative energy generation at the weir system in Kirsch-baumwasen in Germany. The construction work is being carried out by Schleith GmbH construction company w

The Kirchbaumwasen construction site presents many challenges that were particularly evident during construction work. Many new structures have to be connected to the existing buildings and only limited space is available since the construction

High-quality concrete structures for the VIT College railway underpass formed with PASCHAL

An underpass underneath a railway line is currently being built on the approximately 150 hectare large campus site of VIT College in Vellore (India). PASCHAL Form Work (India) Pvt. Ltd. is supplying the formwork for all the cast-in-situ parts for this project and thus enabling the construction work to proceed quickly and easily.

Katara Towers An architectural symbol of hospitality

Timed to be ready for the 2022 FIFA World Cup, a new luxury hotel complex is emerging on Qatar's coast: Katara Towers.

Extension of Edith Stein primary school in Brunswick

In situ concrete structures built with PASCHAL systems combined with precast reinforced concrete elements.

Innovative NeoR lightweight formwork as a further development of the Modular universal formwork

With the new NeoR formwork system, PASCHAL offers a modern lightweight formwork system that offers impressive versatility and a clever design.

BIM in the spotlight Citygate office complex planned entirely in 3D

When the Citygate office complex in Göteborg was designed, the planners weren't just thinking about square meters and building height

In Europe’s biggest roller coaster, the Helix at the Liseberg amusement park in Gothenburg, POG 10 Heavy Duty incremental encoders from Baumer monitor the speed of the carrriage's drive as it approaches the start ramp. The Heavy Duty technology

In Europe’s biggest roller coaster, the Helix at the Liseberg amusement park in Gothenburg, POG 10 HeavyDuty incremental encoders from Baumer monitor the speed of the carrriage's drive as it approaches

Hindware Appliances strengthens its consumer appliance segment with foray into Ceiling fans

Somany Home Innovation Limited, makers of ‘Hindware Appliances’ has forayed into the ceiling fans category under its popular brand ‘Hindware Snowcrest’ to further strengthen its presence in the consumer appliances segment.

Hatching New Solutions for Boiler Corrosion: Cortec's Brand New Boiler Egg™ Revolutionizes Boiler Startup!

ortec® Corporation is proud to unveil its new Boiler Egg™, an exciting companion to an innovative line of water treatment “animals” for corrosion protection of industrial water systems

The charm offensive at Riebeckplatz in Halle, Germany, is brought into shape with PASCHAL's LOGO.3.

GP Papenburg Hochbau GmbH is currently realising its neighbourhood concept for the Millennial brand hotel using 600 m² of PASCHAL's LOGO.3 formwork system.

310 metres above Warsaw – Varso Tower Poland's tallest building in construction

The Polish capital's highrise skyline is expanding steadily. The new Varso Tower is one of the highest buildings in Europe and, when completed,