With the Mumbai-Ahmedabad
Bullet Train Project in full swing, a groundbreaking milestone is underway: the
casting of 76,000 segments for a 16-kilometer tunnel. Employing cutting-edge
Tunnel Boring Machines (TBMs) and the innovative New Austrian Tunnelling Method
(NATM), this project promises to redefine transportation. Each tunnel lining
ring, composed of nine curved segments and one key segment, boasts structural integrity
thanks to high-strength M70 grade concrete. Located in Maharashtra's Thane
district, the sprawling casting yard is a testament to precision and
efficiency, equipped with advanced automation for quality assurance. This
endeavor heralds a new era of high-speed rail connectivity.
Transformative Tunneling: Mumbai-Ahmedabad Bullet Train Project Sets New Standards
Similar Posts