Lintec CCP3000D containerised concrete plant keeps Polish roads on track
“Many projects in Poland typically require
a minimum output of
160-180 m3/hr, so its high performance is proving absolutely
crucial, producing up to 240 m3/hr of ready mix concrete
from its two twin shaft mixers.”
Â
Przemek Modrzejewski
Regional Sales Manager for Eastern Europe,
Lintec & Linnhoff
Working on a 14 km subsection of
Poland’s S7 expressway project, the Lintec CCP3000D containerised concrete
plant will produce 250,000 m3 of concrete for this vital infrastructure
project.
This plant was utilised for the project due to its high concrete production capacity of 240 m3/hr.
With one-fifth of Poland's
expressways now made of concrete, a Lintec CCP3000D containerised concrete
batching plant is supporting this growing trend as it works on one of the most
important infrastructure projects in the country.
Forming a significant part of the Trans-European Transport Network (TEN-T) within the Baltic-Adriatic Corridor – a key priority for the EU – the new S7 expressway will also play a crucial role in Poland's plans to modernise its transport network. Creating better links between the capital and outlying regions, the 720 km-long S7 expressway will head southwards from near Gdańsk on the Baltic Sea coast to Chyzne, just before the Slovakian border. The road is also part of European route E77, which links a number of important towns and cities on its way from Pskov in Russia to the Hungarian capital, Budapest.
Most of the expressway will be built by upgrading the existing National Road 7 (DK 7), typically doubling the number of lanes and adding the expected amenities such as interchanges, bridges and overpasses.
With two-thirds or more of the project now complete, work on the remaining five sections is now underway. On a 14 km subsection of one of these expressways between Napierki and Płońsk, the highly productive Lintec's CCP3000D concrete plant is being fully utilised by Janikowo-based contractor Trans-Am Maciej Antkowiak.
Connecting Napierki and
Mława in the province of Mazowieckie, approximately 130 km north of Warsaw,
this northern slice of the new section will host two of its nine junctions.
Like the other 57 km, it will comprise two 3.5 m-wide lanes, a 2.5 m-wide hard
shoulder and a 0.75 m-wide soft shoulder on either side of a 12 m central
divider. There is also the option to add a third lane depending on future
requirements.Â
Cementing a reputation
Working as a chief subcontractor to Strabag, Trans-Am's Maciej Antkowiak decided to install a Lintec CCP3000D batching plant due to its reputation as one of the best-performing concrete batching plants on the market.
“They specialise in the construction of concrete roads since 1990 and have gained a great deal of experience working on big projects where you can't afford to use machines that aren't up to the task,” explains Przemek Modrzejewski, Lintec & Linnhoff Regional Sales Manager in Eastern Europe. “Many projects in Poland typically require a minimum output of 160-180 m3/hr, so its high performance is proving absolutely crucial, producing up to 240 m3/hr of ready mix concrete from its two twin shaft mixers.”
“Although the plant could churn out these huge quantities 24/7 all year round, jobsite decisions mean it often might only work 10 hours per day,” he adds. “The hot summer meant that the concrete had to be laid at night, and progress in the autumn was also delayed due to rain.”
The two twin shaft mixers in the
Lintec CCP3000D concrete batching plant allow for independent production. They
can produce different batches of concrete at the same time using both the first
mixer in the upper layer and the second mixer in the bottom layer.
The contractor appreciated the
mobility of this huge plant. This is enabled via its modularised structure that
is completely built into ISO shipping containers for economical transportation
as well as easy installation and dismantling.
The EU's Cohesion Fund has contributed
over half of the €450 million investment required for the construction of the
full 71 km section, with the aim of improving European connectivity,
eliminating traffic bottlenecks and boosting trade and tourism.
Apart from a 25 km section running south
from KrakĂłw, the entire S7 project is scheduled for completion by 2026. The
Lintec CCP3000D will remain in service near Mława until late 2022
About Lintec & Linnhoff
Lintec & Linnhoff is a global manufacturer and distributor of leading-edge solutions for the asphalt and concrete industries under the Lintec, Linnhoff and Eurotec brand names. Its products include asphalt mixing plants, concrete batching plants, pavement related technologies and machinery, and specialist concrete cooling solutions.
All its machines are engineered to
the highest levels and exceed global standards for environmental impact,
recyclability and reusability. The company's key technologies include Lintec's
containerised asphalt and concrete batching plants built in 100% certified ISO
sea containers and Linnhoff's screen drum technology.
Lintec & Linnhoff combines the
craftsmanship, precision and engineering expertise of its German heritage with
the exacting standards required to serve the varied needs of the global
construction market. It provides purpose-built solutions to customers that are
supported through its team of global experts and distribution partners.
Lintec & Linnhoff
machinery has helped deliver some of the world's most prominent construction
achievements, including: the Hong Kong-Zhuhai-Macau bridge; Abu Dhabi's Yas
Marina Circuit; The Palm Island, Dubai; and the Storebaelt Bridge Denmark.